The project consists of construction, operation and maintenance of national power transmission grid in, Bangladesh. PGCB is planning to construct Aminbazar-Maowa-Mongla 400kv, 176 km (apprx.) double circuit transmission line for evacuation of power from a 1,320 MW power plant at Rampal, Mongla to 400/230kV substation at Aminbazar. The project was funded by ADB.
Client: Power Grid Company of, Bangladesh (PGCB), 2012- 2019