Energy And Power Projects


Serial No.
 
Name of The Project
 
Year of Completion
1.
GT-35 Gas Turbine, Supply and Installation
1979
2.
East-West Interconnector
1979
3.
Techno-economic Study for Gas Supply to Western Zone
1984
4.
Improvement of Power Distribution System of Savar and Jessore Cantonments
1987
5.
Deep Tubewell Electrification of Barind Integrated Area Development Project
1990
6.
16 Towns Power Distribution Project
1994
7.
Preparation of Final End Use Check Audit of Commodities and Non-Expendable Properties Procured and Utilized by REB, NRECA Under USAID/Bangladesh Rural Electrification Project-III
1996
8.
220 KV Transmission Line Project, Kyrghyz Republic
1996
9.
300 MW Meghnaghat Combined Cycle Power Station
1996
10.
Asset Valuation of Dhaka Electric Supply Company (DESCO)
1997
11.
210 MW Chittagong Thermal Power Station Construction (Unit 2)
1998
12.
2X45 MW Barge Mounted GTPS (Now 155-170 MW CCPC) at Baghabari on BOO Basis (Bijoyer Alo-I)
1999
13.
130 MW Barge Mounted Power Station on BOO Basis
1999
14.
Construction of 360 MW Combined Cycle Power Station at Haripur on BOO Basis
2001
15.
Construction of 450 MW Combined Cycle Power Station at Meghnaghat on BOO Basis
2001
16.
4C Area Coverage Rural Electrification Distribution System Intensification and Expansion Project
2002
17.
Planning and Upgrading of Power Feeding and Distribution System
2004
18.
Maintenance and Operation of Digun S/S Mirpur
2004
19.
65-80 MW Steam Turbine Unit Addition (Bijoyer Alo-II) to 2X45 MW GTPS (Bijoyer Alo-I) Barge Mounted Power Station to convert it into a 165-170 MW CCPS
2006
20.
Renovation of Distribution System Including Maintenance and Operation of Existing System
2007
21.
Construction of 9-storied S&D Office Building
2007
22.
Consultancy Service for Investigation and Updating of Single-Line Diagram, Mapping and Redistribution/Feeder Bifurcation Study on the Basis of Load Flow
2008
23.
Renovation of 33/11/0.4 KV Distribution Line and Substation and Recommending O&M Procedures
2008
24.
33 KV Subtransmission Network Development Study of Group A, Under System Loss Reduction Project
2008
25.
Renovation of Electric Power Distribution System and Recommending O&M Procedures
2008
26.
Nawabganj Palli Bidyut Samiti Project
2009
27.
Madaripur Palli Bidyut Samiti Project
2009
28.
4 Rental Power Station Projects (Combined)
2009
29.
Kumargaon (50 MW) Power Stations Project Under 4 Rental Projects
2009
30.
Shahjibazar (50 MW) Power Stations Project Under 4 Rental Projects
2009
31.
Fenchuganj (50 MW) Power Stations Project Under 4 Rental Projects
2009
32.
Bogra (20 MW) Power Stations Project Under 4 Rental Projects
2009
33.
9 PBS Distribution System Intensification and Expansion Project
2009
35.
15 PBS Distribution System Intensification and Expansion Project Phase 2
2009
36.
50 MW Diesel Rental Power Station
2010
37.
9 PBS Distribution System Intensification and Expansion Project
2010
38.
Energy Efficiency Program I (Power Transmission), Supply and Installation of Capacitor Bank for Reactive Power Compensation at Grid-substation and Reinforcement of Goalpara Substation.
2011
39.
50 MW Power Plant of Rural Power Company Ltd.
2011
40.
Environmental Site Assessment of Meghnaghat-2 1X341 MW CCPP Project
2011
41.
Environmental Site Assessment of Bibiyana 2X335 MW CCPP Project
2011
42.
Aminbazar-Old Airport 230 KV Transmission Line and Associated Substation Under Sustainable Power Sector Development Project
2012
43.
Aminbazar-Meghnaghat 400 KV Transmission Line Project
2012
44.
Nawabganj Palli Bidyut Samiti Project
2012
45.
Madaripur Palli Bidyut Samiti Project
2012
46.
Consultancy Service for Investigation and Updating of Single Line Diagram Mapping and Preparation of Staking Sheet, Materials List and Cost Estimate for 11/6.35/0.4 KV Line
2012
47.
Engineering, Supervision and Design for Electrical Distribution System of Nawabganj Palli Bidyut Samiti Under REER-RDP-1 Project
2013
48.
Engineering, Supervision and Design for Electrical Distribution System of Madaripul Palli Bidyut Samiti Under REEDDP-1 Project
2013
49.
Retainer Consultancy Services for Engineering Supervision and Design for Electrical Distribution System of Madaripur Palli Bidyut Samiti
2015
50.
Retainer Consultant Services for Engineering Supervision and Design for Electrical Distribution System of Chapainawabganj Palli Bidyut Samiti
2015
51.
Engineering Supervision and Design for Electrical Distribution System of Madaripur PBS Under 1.8 Million Consumer Connection Through Rural Electrification Expansion Project
2015
52.
Power Plant Projects at Maheshkhali Upazila in Cox’s Bazar District
2016
53.
Survey, Design, Construction and Supervision of Rural Electrification Upgradation Project in Rajshahi, Rangpur, Khulna and Barisal Divisions - JICA Loan:BD-P63-Package:SDS- (PBS: Chapainawabganj)
2016
54.
Electrical Consultant Services for Electrical Line Design & Supervision of Madaripur PBS under Up-gradation of Rural Electricity Distribution System, Dhaka, Chittagong & Sylhet Division (UREDS, DCSD) Project
2018
55.
Extension of Barapukuria Coal Fired Thermal Power Station by 275 MW (3rd Unit) Project
2018
Copyright © 2010 - BCL Associates Ltd.